Skip to content

Case studies

How Morepen runs batch dossiers and deviations on Synngular

How Morepen runs Synngular across manufacturing and quality. Every figure on this page was measured and reported by Morepen.

Morepen

Pharmaceutical manufacturing

Engagements
2, manufacturing and quality
Systems connected
MES, LIMS, ERP, QMS
Engagement 1
BMR dossier generation
Engagement 2
Deviation and CAPA

Results at a glance

Six outcomes across two engagements.

OutcomeResult
faster modernisation cycle70%
regulatory-compliant dossiers100%
value created$180K
QA hours redeployed a year600+
better audit readiness45%
inspection-ready documentation95%

Engagement 1 · Morepen, pharma manufacturing

BMR dossier generation

Batch manufacturing record dossiers assembled across MES, LIMS, ERP, and quality systems, accelerating batch release within GxP controls.

Challenge
BMR dossiers were assembled by hand across MES, LIMS, ERP, and quality systems.
On Synngular
Agents compile execution data, quality records, and approvals into release-ready dossiers, with GxP controls on every step.
Systems
MESLIMSERPQMS
Modules
Governed connectorsReportAskAudit trail

Weekly release readiness

Mon 18 Nov · to QA leads, Site 1

Ready for release
9
Pending QA review
2
Blocked by an open deviation
1

B-2411-068 waits on deviation DEV-0412, open 9 days.

Sources MESQMS

faster modernisation cycle
70%
faster modernisation cycle
regulatory-compliant dossiers
100%
regulatory-compliant dossiers
value created
$180K
value created

Engagement 2 · Morepen, pharma quality

Deviation and CAPA

Investigation orchestration and root-cause analysis across quality, manufacturing, and regulatory systems.

Challenge
Deviation investigation and CAPA coordination ran across quality, manufacturing, and regulatory systems.
On Synngular
Investigation orchestration, root-cause analysis, and compliance automation, with closure tracked to completion.
Systems
QMSMESLIMS
Modules
Deviation and CAPAForeseeAskAudit trail
  • Watch: Granulator 2 LOD trending toward the upper limit

    Rising since shift 2, now 2.3 % of 2.5 %

    MESLIMS

  • Act: Tablet press TP-04 qualification lapses in 6 days

    2 scheduled batches use TP-04

    QMSERP

  • Watch: 3 batch reviews aging past 5 days

    Oldest: B-2411-061, 8 days

    QMS

QA hours redeployed a year
600+
QA hours redeployed a year
better audit readiness
45%
better audit readiness
inspection-ready documentation
95%
inspection-ready documentation

How an engagement runs

How we take one workflow from scope to production, and then to the next.

  1. 01

    Scope

    Pick the one workflow that backs up batches the most, and agree how success will be measured.

  2. 02

    Connect

    Governed, role-mapped connections to the systems that workflow reads.

  3. 03

    Run in production

    Agents are typically in use in under three weeks; validated modules follow the plant's validation schedule.

  4. 04

    Measure and scale

    Results measured by the customer, then the next workflow on the same record.

Paper, document eBMR, or Synngular

What changes for the people who review, release, and audit.

Paper batch records compared with document-style eBMR and Synngular
PaperDocument eBMRSynngular
Record reviewEvery line, by handBy exception, where the tool supports itChanges shown version to version
Finding answersA walk to the archiveKeyword search inside documentsPlain questions, answers that cite records
Audit prepBinders, built over weeksSearchable, compiled per requestOne audit trail per record, always current
DriftFound at review, or at deviationTrend charts pulled by handWarned before the limit, with evidence